Commercial Ship Offshore Plant ( Rig, Fixed Platform, Drill Ship, Derrick, FPSO ) |
![]() |
- Preservation : Protect warehousing and installed equipments for maintaining their efficiency. Periodic check and complementary measures. |
- Installation & Inspection : Install equipments at the right time and inspect |
- Punch Clearing : Check the Punch item and Clearing with good manner. |
- Mechanical Completion : Inspect installed physical item completion by System unit and Verify. |
- Valve remote control system / Hydraulic pressure pipe system |
- Manual hydraulic deck stand system / Atomic energy instrument system |
![]() |
---|
Offshore Plant ( Rig, Fixed Platform, Drill Ship, Derrick, FPSO ) |
![]() |
- Equip. & drawing study : Study and check the type of loop on equipment and drawing for installation |
- Installation & Inspection : Install Support, Tray, Clamp and Line installation |
- Punch Clearing : Check the Punch item and Clearing with good manner |
- Mechanical Completion : Inspect installed physical item completion by System unit and Verify |
- Valve remote control system / Hydraulic pressure pipe system |
- Manual hydraulic deck stand system / Atomic energy instrument system |