본문바로가기(skip to content)

메인으로 바로가기


Items
Offshore Plant ( Rig, Fixed Platform, Drill Ship, Derrick, FPSO )
Business
This process described general requirements for oil flushing of piping system. Flushing is aimed at protecting equipment and inside surface of the pipe from unexpected pollution including foreign substances (rust, mill scale, lacquer) that might cause trouble for system or device operation, and keeping function and durability.
- Oil transportation pipe system / L.O system (purifying, transfer)
- Ship deck machinery hydraulic system / F.O service system
- Auto gear system / Seal oil system
- valve remote control system / Hydraulic pressure pipe system
- Manual hydraulic deck stand system / Instrument system
Oil Flushing Step
  • Preliminary Piping
    [Circuit Composition]
  • Line check /
    Equip. Preparation
  • Inspection Circulation
  • Leak Test /
    Line Blowing
  • Oil Flushing
  • Secondary Flushing
    (Tank Cleaning / Oil Charge)
  • Inspection (NAS Grade Check)
  • Oil recharge / Commissioning
Chemical Cleaning
Item
Offshore Plant ( Rig, Fixed Platform, Drill Ship, Derrick, FPSO )
Business
Pickling makes inside and surface of the pipe clean, removing rust that might cause trouble for operation and maintenance, preventing the surface of carbon steel pipe from rotting by artificially forming phosphate and film, cutting off disorder of equipment or inner damage in advance aiming at maintaining function and durability. At least, the whole piping system of the following service needs to execute pickling after finishing piping hydraulic pressure test.
- Compressor Suction Piping (from the scrubber, Filter or K.O Drum)
- Compressor Inter stage Coolers, and Suction and Bypass Piping
- Compressor Suction Pulsation Dampeners
- Lube Oil / Seal Oil / Control Oil / Hydraulic Oil Piping
- Fuel Gas Piping to Equipment Drivers
- Diesel Fuel piping to Equipment Drivers
Chemical Cleaning Step
  • Preliminary Piping
    [Circuit Composition]
  • Inspection Circulation
  • Pre Cleaning (Temp/Ph Chemical Density)
  • PASSIVATION
  • Drying (Dew Point Check)
  • Inspection (Visual. Black Night)
  • PACKING (VPI 260 Powder / N2 Purge)
  • Leak Test / Line Blowing

3370, Geoje-daero, Geoje-si, Gyeongsangnam-do, Korea TEL : 055-681-7271, 681-7371 FAX : 0303-3442-6472
Copyright(C) 2005 Shinhan Machinery Co.Ltd., All Rights Reserved.