Offshore Plant ( Rig, Fixed Platform, Drill Ship, Derrick, FPSO )
Business
Preparation Comm'g Plan :
Preservation, Instrument Calibration check
Pre-Commissioning :
Check the motor turn direction, test the logic and function on electric and instrument panel, safety check for logic test on control panel after Mechanical completion.
Commissioning :
After the Pre-commissioning, run the system for verifying function, noise, and vibration under the commissioning procedure and carry out system test on logic, engineering, loop and cause & effect
Sea Fastening & Preservation :
After the commissioning, under the client’s request power off, remove test fluid, fuel oil, lube oil and tie up or covering, put desiccant, paint, install space heater.
COMMISSIONING Step
  • Comm'g Plan / Pack / Equip.
    Preparation
  • Mechanical Completion
  • Pre-Commissioning
  • Commissioning
  • Internal Sea Fastening &
    Long Term Preservation
Preservation / Instrument calibration
System leak test
Power energizing
Bunkering
Logic & safety check for control, system & Safety device calibration
I/O Check, cause & effect test
System operability test
System commissioning & operation
COMMISSIONING Plan
COMMUNICATION NET WORK FOR COMMISSIONING
  • CLIENT
  • ENGINEERING
  • COMMISSIONING
    MANAGER
  • QA / QC
  • VENDOR REP
COMMISSIONING Plan
MANAGEMENT / EXECUTION OF HSE
  • SAFETY
    CAMPAIGN
  • ENGINEERING
  • HSE EDUCATION
    PROGRAM
  • NO ACCIDENT
  • HSE AUDIT
    / MEETING
  • HSE INCENTIVE
    PROGRAM
  • HSE SHARING &
    COMMUNICATION
  • PERMIT TO WORK