Offshore Plant ( Rig, Fixed Platform, Drill Ship, Derrick, FPSO ) |
Business |
Preparation Comm'g Plan : Preservation, Instrument Calibration check |
Pre-Commissioning : Check the motor turn direction, test the logic and function on electric and instrument panel, safety check for logic test on control panel after Mechanical completion. |
Commissioning : After the Pre-commissioning, run the system for verifying function, noise, and vibration under the commissioning procedure and carry out system test on logic, engineering, loop and cause & effect |
Sea Fastening & Preservation : After the commissioning, under the client’s request power off, remove test fluid, fuel oil, lube oil and tie up or covering, put desiccant, paint, install space heater. |
Preservation / Instrument calibration |
---|
System leak test |
Power energizing |
Bunkering |
Logic & safety check for control, system & Safety device calibration |
I/O Check, cause & effect test |
System operability test |
System commissioning & operation |